Skip to content

koshizuka

English | Japanese

« Home · « Free surface

Koshizuka & Oka (1996) dam break -- the canonical free-surface collapse validation (as used e.g. by Pham Van Phuc et al., Nagare 32 (2013) 433, with interFoam VOF). A water column collapses in a closed tank; the two quantities judged are the leading-edge front position z on the floor and the residual column height b at the back wall, both non-dimensional: z/a and b/(2a) vs T = t sqrt(2 g / a) These test the FRONT PROPAGATION SPEED directly and have low grid dependence -- the right first check before the SPHERIC Test 2 slamming pressures.

Geometry

koshizuka geometry

Animation

Fields

The fields this computation wrote at its last output step, plotted as they are. 3D cases show the mid-plane.

koshizuka phi

koshizuka umag

Build & run

cmake -S native -B native/build && cmake --build native/build -j
./native/build/orheo-koshizuka

Validation

Tier T2 — single-point comparison
QoI z/a, b/2a
Reference Koshizuka & Oka (1996)
Gate 🧩 module gate (two_phase_laplace)

Source & run details

View source

Item Value
Target orheo-koshizuka
Source native/benchmarks/koshizuka.cpp
Lattice —
GPU twin yes (orheo-koshizuka-gpu)
Modules two_phase.hpp
Gallery run failed — exit 1

Computation log

The actual output of this computation (head and tail).

Koshizuka dam break: grid 192x192x48 (a=48 cells, dx=0.0030 m), dt=3.937e-05 s, ratio=1000, glat=5.0e-06, nu=0.0050, MRT
step      0/8000  T=0.00  z/a=1.00  b/2a=1.00  umax=0.00e+00
step    400/8000  T=0.18  z/a=1.02  b/2a=1.00  umax=6.42e-03
step    800/8000  T=0.37  z/a=1.06  b/2a=0.99  umax=1.25e-02
step   1200/8000  T=0.55  z/a=1.12  b/2a=0.98  umax=2.09e-02
step   1600/8000  T=0.73  z/a=1.23  b/2a=0.97  umax=3.17e-02
step   2000/8000  T=0.91  z/a=1.35  b/2a=0.96  umax=4.17e-02
step   2400/8000  T=1.10  z/a=1.48  b/2a=0.94  umax=5.68e-02
step   2800/8000  T=1.28  z/a=1.62  b/2a=0.93  umax=6.64e-02
step   3200/8000  T=1.46  z/a=1.77  b/2a=0.91  umax=7.69e-02
step   3600/8000  T=1.64  z/a=1.96  b/2a=0.90  umax=9.03e-02
step   4000/8000  T=1.83  z/a=2.12  b/2a=0.88  umax=9.69e-02
step   4400/8000  T=2.01  z/a=2.31  b/2a=0.86  umax=9.51e-02
step   4800/8000  T=2.19  z/a=2.50  b/2a=0.85  umax=9.92e-02