コンテンツにスキップ

koshizuka-fs-d3q27

英語 | 日本語

« Home · « 自由表面

Koshizuka & Oka (1996) dam break with the D3Q27 FREE-SURFACE LBM + CUMULANT collision (free_surface_d3q27.hpp). Companion to koshizuka_fs.cpp (the D3Q19 Koerner/Thuerey free surface). Only the water is simulated; the gas is an atmospheric-pressure BC, so this gives gauge pressure directly and is stable through the violent run-up. Writes koshizuka.csv (T, z/a, b/2a) for overlay with the experiment via scripts/compare_koshizuka.py.

概要: 同じダム決壊を D3Q27 キュムラント自由表面で解く。D3Q19 中心モーメントで見られた質量損失が解消される経路。

Geometry

koshizuka-fs-d3q27 geometry

Animation

Fields

この計算が最後の出力ステップで書き出した場をそのまま描いたもの。3D ケースは中央断面。

koshizuka-fs-d3q27 fill

koshizuka-fs-d3q27 umag

Build & run

cmake -S native -B native/build && cmake --build native/build -j
./native/build/orheo-koshizuka-fs-d3q27

このページの図を作った計算のコスト(Miyabi-G Grace CPU (72 cores, -stdpar=multicore)): 175.3 s wall。

Validation

Tier T2 — 単点比較
QoI z/a, b/2a
Reference Koshizuka & Oka (1996)
Gate 🧩 モジュールゲート (free_surface)

Source & run details

View source

Item Value
Target orheo-koshizuka-fs-d3q27
Source native/benchmarks/koshizuka_fs_d3q27.cpp
Lattice D3Q27
GPU twin yes (orheo-koshizuka-fs-d3q27-gpu)
Modules free_surface_d3q27.hpp
Gallery run 2026-07-27 @ 6fd4661e
Args ``
Wall time 175.33 s
CPU time 11708.55 s
Device Miyabi-G Grace CPU (72 cores, -stdpar=multicore)

Computation log

この計算の実際の出力(先頭と末尾)。

Koshizuka (D3Q27 free-surface LBM): grid 192x192x48 (a=48, dx=0.0030 m), dt=2.490e-05 s, glat=2.0e-06, nu=0.0020, cs=0.16, D3Q27-CUMULANT, free-slip walls
step      0/16000  T=0.00  z/a=1.04  b/2a=1.02  umax=0.00e+00
step    800/16000  T=0.23  z/a=1.06  b/2a=1.01  umax=3.43e-03
step   1600/16000  T=0.46  z/a=1.15  b/2a=1.00  umax=6.29e-03
step   2400/16000  T=0.69  z/a=1.25  b/2a=0.97  umax=8.78e-03
step   3200/16000  T=0.92  z/a=1.40  b/2a=0.93  umax=1.56e-02
step   4000/16000  T=1.15  z/a=1.54  b/2a=0.89  umax=8.23e-02
step   4800/16000  T=1.39  z/a=1.73  b/2a=0.84  umax=1.38e-01
step   5600/16000  T=1.62  z/a=1.96  b/2a=0.79  umax=8.18e-02
step   6400/16000  T=1.85  z/a=2.21  b/2a=0.73  umax=1.20e-01
step   7200/16000  T=2.08  z/a=2.48  b/2a=0.69  umax=1.67e-01
step   8000/16000  T=2.31  z/a=2.75  b/2a=0.64  umax=1.46e-01
step   8800/16000  T=2.54  z/a=2.98  b/2a=0.64  umax=9.55e-02
step   9600/16000  T=2.77  z/a=3.17  b/2a=0.59  umax=6.48e-02