Koshizuka & Oka (1996) dam break with the SINGLE-PHASE FREE-SURFACE LBM (free_surface.hpp; Koerner/Thuerey + MRT + Smagorinsky LES). Companion to koshizuka.cpp (two-phase phase-field). Only the water is simulated; the gas is an atmospheric-pressure BC, so this gives gauge pressure directly and is stable through the violent run-up. Writes koshizuka.csv (T, z/a, b/2a) for overlay with the experiment via scripts/compare_koshizuka.py.
概要: 越塚・岡のダム決壊実験。単相自由表面 LBM(VOF)で水だけを解き、気相は大気圧境界として扱う。先端到達位置と水柱高さの時系列を実験と比較する。自由すべり壁と Mach 数の整合が精度を左右する。
Geometry¶

Animation¶
Fields¶
この計算が最後の出力ステップで書き出した場をそのまま描いたもの。3D ケースは中央断面。


Build & run¶
このページの図を作った計算のコスト(Miyabi-G Grace CPU (72 cores, -stdpar=multicore)): 216.5 s wall。
Validation¶
| Tier | T2 — 単点比較 |
| QoI | z/a, b/2a |
| Reference | Koshizuka & Oka (1996) |
| Gate | 🧩 モジュールゲート (free_surface) |
Source & run details¶
| Item | Value |
|---|---|
| Target | orheo-koshizuka-fs |
| Source | native/benchmarks/koshizuka_fs.cpp |
| Lattice | — |
| GPU twin | yes (orheo-koshizuka-fs-gpu) |
| Modules | free_surface.hpp |
| Gallery run | 2026-07-27 @ fc5fbb30 |
| Args | `` |
| Wall time | 216.53 s |
| CPU time | 9540.03 s |
| Device | Miyabi-G Grace CPU (72 cores, -stdpar=multicore) |
Computation log¶
この計算の実際の出力(先頭と末尾)。
Koshizuka (free-surface LBM): grid 192x192x48 (a=48, dx=0.0030 m), dt=2.490e-05 s, glat=2.0e-06, nu=0.0020, cs=0.16, MRT, free-slip walls
step 0/16000 T=0.00 z/a=1.04 b/2a=1.02 umax=0.00e+00
step 800/16000 T=0.23 z/a=1.06 b/2a=1.01 umax=3.79e-03
step 1600/16000 T=0.46 z/a=1.15 b/2a=1.00 umax=6.77e-03
step 2400/16000 T=0.69 z/a=1.25 b/2a=0.97 umax=1.41e-02
step 3200/16000 T=0.92 z/a=1.42 b/2a=0.93 umax=1.48e-02
step 4000/16000 T=1.15 z/a=1.60 b/2a=0.89 umax=1.76e-02
step 4800/16000 T=1.39 z/a=1.79 b/2a=0.83 umax=1.92e-02
step 5600/16000 T=1.62 z/a=2.02 b/2a=0.78 umax=2.20e-02
step 6400/16000 T=1.85 z/a=2.27 b/2a=0.73 umax=1.96e-02
step 7200/16000 T=2.08 z/a=2.54 b/2a=0.67 umax=2.15e-02
step 8000/16000 T=2.31 z/a=2.81 b/2a=0.61 umax=2.34e-02
step 8800/16000 T=2.54 z/a=3.10 b/2a=0.57 umax=2.38e-02
step 9600/16000 T=2.77 z/a=3.40 b/2a=0.52 umax=3.08e-02